This slide presentation outlines an integrated decision support system for capital improvement planning. Project goals included:study the Benefits of aStructured Asset Management System toprioritize capital improvement planning,repair and rehabilitation, andoperations and maintenance. Project approach included:Structured Decision-Making Process;Use Harfan Technologies to Analyze MultipleFunding Scenarios Based on Existing Data fromCMMS and GIS;Enhance Data with Rapid Field Survey;Run Analysis with Enhanced Data from InfraMetrixCondition Assessment;Develop an Integrated Model; and,Consider the Affect of the Water System on theSewer System. Includes figures.
Product Details
Edition: Vol. - No. Published: 03/01/2006 Number of Pages: 21File Size: 1 file , 1.1 MB