Sale! View larger

Seminar 53 -- Commissioning a Central Chilled Water Plant

New product

Seminar 53 -- Commissioning a Central Chilled Water Plant

Conference Proceeding by ASHRAE, 2017

David Cohen, P.E.

More details

$21.07

-57%

$49.00

More info

Full Description

This product contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

Preparing equipment and assemblies for final check-out verification, start-up procedure and proper operation requires a coordinated activity of testing, adjusting, measurement and documentation that will ensure a successful result. This session describes how the commissioning process would be applied to achieve a successful chilled water plant operation needed to comply with the owner's project requirement and the design documents.

Commissioning Chilled Water and Condenser Water Pumps
David Cohen, P.E., Member, Grumman/Butkus Associates, Evanston, IL

Run Time: 90 mins.

Citation: ASHRAE Seminar Recordings, 2017 ASHRAE Winter Conference, Las Vegas, NV

Product Details

Published: 2017Units of Measure:DualFile Size: 1 file , 370 KB Product Code(s): D-LV17Sem53