New product
Conference Proceeding by ASHRAE, 2014
H. Jay Enck, Member ASHRAE; Norman Nelson, P.E., Member ASHRAE
Warning: Last items in stock!
Availability date:
This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.
A comprehensive commissioning process provides a facility's staff with information necessary to efficiently operate building systems. A formal monitoring based commissioning (MBCx) effort is also useful in investigating operational issues, troubleshooting, determining actions required to permanently correct the problem, reducing the frequency of issue reoccurrence and improving equipment maintenance due to wear and tear on equipment. This session provides a case study where the commissioning process optimized the efficient facility that was delivered, and reviews the benefits of MBCx in achieving peak building system performance throughout a facility's lifetime.
Using Monitoring Based Commissioning to Improve the Capabilities of OM StaffCitation: ASHRAE Seminar Recordings, 2014 Annual Conference, Seattle, WA